Miter Gate Storage
Design-Build project for the construction of a marine based storage facility on the Ohio River. This project included site grading, dredging, shore protection, utilities, steel sheet pile bulkhead, driven steel h-piles and reinforced concrete. We were responsible for the transportation and assembly of two 250-ton steel miter gates. This involved heavy lifting, welding, pre-stressing and field painting in accordance with government specifications.